Scoping a Pre-Drywall Inspection: Timing, Builder Access and Report Limits

Inspector ToolbeltNovember 28, 2026Home Inspection Practice5 min read
Interior of a new house before drywall with exposed studs, blue water lines, white drain pipes, yellow wiring, overhead ductwork and a flashlight on the subfloor.

AI-generated image of a new house at the rough-in stage, the point at which a pre-drywall inspection is typically performed.

A buyer under contract on a new build calls and asks whether you can “look at the house before the walls go up.” Saying yes is easy. Delivering a pre-drywall inspection everyone can live with takes more setup than a resale job, because most of the variables are controlled by the builder.

The useful work happens before you arrive: pinning down timing, confirming permission to be on the site, and agreeing in writing on what a rough-in inspection does and does not cover.

Start from a published standard, not a promise

Two widely used references describe this inspection. ASHI publishes auxiliary standards for residential predrywall inspections, and InterNACHI publishes a pre-drywall inspection standard of practice, which also calls it a rough-in inspection. Both are voluntary association standards. Neither is a state law, and your state licensing rules, if any apply to new-construction work, still govern. Pick the standard you will perform to and name it in your agreement.

The two documents agree on the most important boundary. ASHI’s version says the inspection is performed by a construction generalist and does not confirm conformity with building codes, manufacturer installation instructions, or construction plans. InterNACHI’s version also excludes code compliance. Many buyers assume they are buying a second code inspection. Correct that at booking, or your report will be read against a standard you never agreed to meet.

Timing is a condition, not a date

ASHI says the inspection should occur after the foundation, the floor, wall and roof structure, the plumbing, electrical and other rough-in components, and the windows and exterior doors are installed. InterNACHI describes a similar point: after framing, roofing, exterior covering, doors, windows, mechanicals, plumbing and electrical are in, and before insulation and interior coverings go on. ASHI allows a different timing if the client agrees.

In practice, that means the appointment date is provisional until the builder confirms the house has reached that stage. Ask the client to get written confirmation from the builder’s superintendent a day or two ahead, and tell them what happens if you arrive and the HVAC rough-in or the windows are not installed. You can document the missing items as not inspected, reschedule, or perform a narrower inspection. Decide which before the visit, and charge accordingly.

The opposite risk is arriving after insulation goes in, when much of what the client paid to see is covered. Avoid booking far out on a date the builder has not committed to.

Who arranges access

ASHI’s standard puts the scheduling with the builder and the permission to enter on the client, not the inspector. It also says inspectors are not required to enter areas restricted by the builder, trade contractors or the property owner, and are not required to move construction materials or equipment.

Write those points into your process. Require the client to confirm builder permission before you book, and record the superintendent’s name and site rules, such as check-in requirements or areas that are off-limits. If a crew is working in the attic or a lift blocks the garage, the report should say what was present but not inspected and why. That mirrors the residential approach covered in our article on reporting access limitations accurately.

What the report should say

ASHI’s pre-drywall report requirements are short. Identify components that, in your professional judgment, are significantly deficient, explain the reasoning when it is not self-evident, recommend correction, further evaluation or monitoring, and list designated components that were present but not inspected, with reasons. The standard also states the inspection is not numerically complete, so you are not checking every nail plate or every stud.

Keep findings factual and observable. “Drain line notched through the top of the joist at the hall bath” is useful to a superintendent. “Not to code” invites a dispute you agreed not to have. If a condition clearly needs an engineer or a licensed trade, say so and stop there.

Booking it as its own service

Because the scope, timing and access rules differ from a resale inspection, treat pre-drywall as a separate service with its own agreement language. InterNACHI also publishes a sample new construction phase inspection agreement that splits the work into phases with a report after each. Have your own attorney review whatever you adapt, as discussed in our article on attorney review of client agreements.

In the new Inspector Toolbelt app, you can set this up as its own service category. The Help Center’s Service Categories guide explains that each category can have its own lead time, and that individual services can be hidden from the public booking page so they are booked by the office only. That is a reasonable fit for an inspection whose date depends on a builder’s confirmation.

A practical next step: write a one-paragraph pre-drywall scope statement this week, naming the standard, the timing condition, the client’s access responsibility and the code exclusion. Send it with every quote. For more on adding new-construction work as a line of business, the podcast episode on how home inspectors add new verticals is a good companion.